Mitumba Project
Mitumba (Dominates the western portion of the license area)
Size: 1,000sqkm
Over 61 linear kilometers of Basement / Lower Roan contact zone
202sqkm Lower Roan host lithologies
VTEM survey in 2008 identified two possible drill sites (#01 and #20) in two separate target areas (1a and 1b) with soil geochem coincidence.
Northern portion of the license area was not covered by the 2008 VTEM survey
Basement / Lower Roan / Upper Roan contact zones covered by regional soil geochem, traverses spaced approx. 1km apart. At least three soil geochem targets have been identified north of the area covered by the 2008 VTEM survey. Additional sampling will be considered to confirm the lateral extent of one target area into the Basement lithologies from the Upper Roan, possibly indicating mineralization along a geological structure.
A widely spaced (400m lines) VTEM survey is planned to cover the northern portion of the project area.
MAPS |
 |
 |
 |
|
Mitumba Target 20 AS 30K
|
Mitumba Target 20
CAD 30K |
Mitumba Target 20
TAU 30K |
|
Projects
Mukuba Overview
License Highlights
Mitumba Project
Mukulefumo Project
Munkumpu Project
Puku Project
Kantobo Project
Lunga (PLLS363)
Photo Gallery |